Work has restarted back in the master bathroom. We gutted it in late July, shortly before moving in, to keep the mess to a minimum when we would be ready to tackle it. Of course it is still messy working in there, just less than it could have been at this point.
![]() |
View looking in from the bedroom |
Zachary re-drywalled the entire bathroom with mildew/mold resistant board, and added new normal drywall where needed in the attached walk through closet.
![]() |
Closet space |
The bathroom drywall is a nice sea green color, compared to white. We haven't decided on a color theme in there, but a sea green color is in the running now.
![]() |
Wall where the vanity and storage cabinet will be |
Zachary framed out the shower stall, where the old tub/shower was, so he didn't have to move plumbing.
He installed small moisture friendly can lights in the shower and cement board on the walls for tiling later.
![]() |
Nook where the toilet will go. |
![]() |
View from the shower stall to the bathroom doorway. |
No comments:
Post a Comment